JOURNAL OF FACULTY OF CIVIL ENGINEERING 44, 2023.y., pp. 20-33
APPLICATION OF DIFFERENT GEODETIC METHODS IN CLAY VOLUME MEASUREMENT FOR BRICK PRODUCTION |
|
DOI: 10.14415/JFCE-895 |
UDC: 553.611:528.02 |
CC-BY-SA 4.0 license |
Author : Stojčinović, Dejan; Kuburić, Miroslav; Davidović Manojlović, Marina |
|
| Summary: |
| The purpose of this research is to present the outcomes of volume calculations using three distinct surveying technologies: total station, GNSS, and UAV. A comprehensive examination of each of these methods is conducted and subsequently applied to the same project, which involves measuring the volume of clay for a factory in Novi Bečej. The time required for surveying, data processing, and the resulting volume calculations are scrutinized to determine the most suitable approach. Each method offers its own set of advantages and limitations, and the decision on which method to employ hinges on the specific project requirements and the desired level of precision. The disparities in the results underscore the significance of selecting the most fitting method for a given application while taking into account potential uncertainties and errors. |
|
| Keywords: |
| clay, total station, UAV, GNSS, surveying, volume calculation |
|
|
|