Zbornik radova
Građevinskog fakulteta


JOURNALS
ZBORNICI
NAUČNI SKUPOVI
ELEKTRONSKI UDŽBENICI
ARHIVA








ZBORNIK RADOVA
4. MEĐUNARODNE KONFERENCIJE
SAVREMENA DOSTIGNUĆA U GRAĐEVINARSTVU 2016 , 2016.god., str. 489-494


SOIL IMPROVEMENT ASSESSMENT. CASE STUDY FIVE STOREY HIGH BUILDING FOUNDATION
 
DOI: 10.14415/konferencijaGFS 2016.050
UDK: 624.131.382
CC-BY-SA 4.0 license
Autor : Ionita, Ana Maria; Sbîrciog, Ionela; Tuns, Ioan
 
 Rezime:
 In normal soil conditions, building foundation works represent approximately 15to 18 percent from the total costs and from 12 to 15 percent from the total labour costs. In difficult foundation soils (reduced mechanical resistances) the infrastructure works may exceed 50 percent from the total costs of the investment, thus the chosen foundation system is important from the cost point of view. In the present paper are presented two technical solutions for soil improvement: through piles and through soil injection.
 
 Ključne reči:
 soil investigation, soil improvement, soil assessment